往复容积泵技术条件.docx

上传人:太** 文档编号:60281613 上传时间:2022-11-15 格式:DOCX 页数:9 大小:28.58KB
返回 下载 相关 举报
往复容积泵技术条件.docx_第1页
第1页 / 共9页
往复容积泵技术条件.docx_第2页
第2页 / 共9页
点击查看更多>>
资源描述

《往复容积泵技术条件.docx》由会员分享,可在线阅读,更多相关《往复容积泵技术条件.docx(9页珍藏版)》请在得力文库 - 分享文档赚钱的网站上搜索。

1、Issue 05.2002LS-Class: BMTechnical SpecificationPositive Displacement Pumps - Reciprocating based on API 674 second editionOrig.:Checked:Appr.:Total 9 PagesDescriptors: Rotating Equipment, Displacement Pump, Pump, API 674Replaces Issue 12.98CONTENTSPage0FOREWORD21 GENERAL2Scope21.1 Alternative Desig

2、ns2Conflicting Requirements21.2 Definition of Terms2Referenced Publications21.3 Unit Conversion2BASIC DESIGN31.4 General3Selection of Types31.5 Ratings3Cylinder and Pressure-Retaining Parts (IncludingPulsation Suppression Devices)3Cylinder Connections31.6 Liquid End Appurtenances3Power End Running G

3、ear31.7 Gas End, Direct-Acting Pump3Lubrication4 2.10 Materials2.11 Nameplates and Rotation Arrows4Quality43 ACCESSORIES52.3/ 巧.6.73 3 3 3 3 3 42.3/ 巧.6.73 3 3 3 3 3 4J 2.3/ J 2.344.4.45555Couplings and Guards5Mounting Plates5Controls and Instrumentation6Piping6Pulsation and Vibration Control Requir

4、ements7Special Tools7INSPECTION, TESTING, AND PREPARATION FORSHIPMENT7General7Inspection7T ests7Preparation for Shipment8VENDORS DATA8General8Proposals8Contract Data9Page 2Issue 05.20020 FOREWORDThis specification contains modifications (Mod) and additions (Add) to API Standard 674, second edition,J

5、une 1995, which is a part of this specification Paragraph numbers used below are the API 674 paragraph numbers. Paragraphs not mentioned below shall remain as they are described in API 674Paragraphsmarkedin API with a bullet shall apply as stated, if not statedotherwise in thisspecification. Paragra

6、ph numbersherein which do not appear in API 674 are new paragraphs(Newpara)which areinserted in alphabetical and/or numerical order. Paragraphsor partsof it which are substituted are marked with (Subst). Paragraphsor partsof it which are deleted (Delete) shall not apply.The statements of this specif

7、ication are to be observed, if deviations are not explicitly specified in other documents (purchase order, data sheet, job-referred specification, etc).This specification shall be applied with Pumps - Technical Specification - General”.1 GENERALScope(Add): This specification covers the minimum requi

8、rements for reciprocating positive displacement pumps, their spare parts and accessories (if other special specifications are not valid).1.1 Alternative Designs(Add): Alternative designs deviating from this specification, but suitable for the operating conditions, may be offered in addition. Deviati

9、ons from this specification shall be specified in the proposal for approval by Purchaser.1.2 Conflicting Requirements(Add): The Vendor has to bring discrepancies to Purchasers attention.1.3 Definition of Terms(Add): The term Purchaser as used in this specification shall refer to Linde and/or its aut

10、horized representatives.The term Vendor as used in this specification shall refer to manufacturer of the equipment including his subcontractors.1.4 Referenced Publications(Mod): Instead of the American standards, codes and specifications shown in API 674, the equivalent German standards, codes and s

11、pecifications, respectively standards, codes and specifications applicable for the plant, are valid.1.5 Unit ConversionNo modifications.2 BASIC DESIGNGeneral2.1.3 (Add): See Data Sheet*.2.1.4 (Add): The max. permissible sound power level or sound pressure level will be specified on the “Vendor Noise

12、 Data Sheef.2.1.7 (Add): The required clearance areas shall be shown definitely in the outline drawings.2.1.8 (Mod): Motors, electrical components and installations shall be suitable for the area classification specified on the Pumps - Technical Specification - General and/or Data Sheet”.2.1.12 (Add

13、): All equipment covered by this specification shall be suitable for operation outdoors, totally unprotected from the weather. Conditions and further informations are noted on the Pumps - Technical Specification - General and/or Data Sheet*.2.2 Selection of TypesNo modifications.2.3 Ratings2.3.5 (Ad

14、d): If necessary, compressibility data w川 be specified on Data Sheet”.2.4 Cylinder and Pressure-Retaining Parts (Including Pulsation Suppression Devices)No modifications.2.5 Cylinder Connections(Add): Inlet and outlet connections shall be flanged. Inlet and outlet nozzles shall be designed for the s

15、ame pressure if not specified otherwise.2.5.6.4(Add): Other connections shall be noted for consideration in the proposal.2.6 Liquid End Appurtenances(Add): A cooling/heating jacket shall be supplied if necessary for the specified operating conditions. Operating and design conditions of the cooling w

16、ater/heating system are specified on Pumps - Technical Specification - General44 and/or Data Sheer.2.6.5 (Add): Stuffing boxes and packing design shall be Vendors standard for the specified services.2.6.5.1 (Add),. Operating and design conditions for the cooling water/heating system are specified on

17、 Pumps -Technical Specification - General“ and/or Data Sheet.2.6.6.3 (Add): See Data Sheet.2.6.6.8 (Add): Stuffing boxes and packing design shall be Vendors standard for the specific services. Fluidwill be specified on Data Sheet.2.7 Power End Running Gear(Add): If not specified otherwise, the provi

18、sions specified in 2.7.1.1 through 2.7.1.4 shall apply.2.7.9 (Add): A connection for insertion of an oil heater shall be provided if not specified otherwise.2.7.11 (Add): The distance piece shall be equipped with Vendors standard safety guards if not specified otherwise.2.8 Gas End, Direct-Acting Pu

19、mpNo modifications.Page 4Issue 05.20022.9 Lubrication2.9.1.2 (Add): If not specified otherwise, Vendors standard system shall be used.2.9.1.7 (Add): Additionally a switch-over full-flow twin oil filter shall be used if not specified otherwise.2.9.1.8 (Add): Specified on Data Sheet.2.9.1.9 (Add): Spe

20、cified on Data Sheet:2.9.1.10 (Add): Specified on Data Sheet.2.9.2.1(Add): If not specified otherwise, Vendors standard system shall be used for the specified services.2.10 Materials2.10.1.6 (Add): See Pumps - Technical Specification - General and/or Data Sheet.2.10.1.9 (Add): If there is any presen

21、ce of H2S in the media it w川 be specified on the Data Sheet.2.10.2.3.1 (Add): M weld repairs of pressure casings have to be approved by the Purchasers material inspection department prior to repair.2.10.2.3.2 (Mod): Repair by plugging will not be accepted. Defective parts of grey iron or nodular iro

22、n shall be replaced by regular parts.2.10.4.5.1 (Add): Are specified in the relevant purchasers technical specification.2.10.4.5.4 (Mod): The proposed connection designs shall submitted to the purchaser for approval before fabrication.2.10.5 (Add): For pumping temperatures below -29 C, carbon steel

23、and alloy steel for pressure casing, plunger, cylinder and valves shall be impact tested at the lowest operating temperature if not specified otherwise. The operating temperature can decrease down to design temperature. If not specified otherwise, at pumping temperatures below -10O C the AD Instruct

24、ional Pamphlet W10u shall be used.2.10.5.3 (Mod): The minimum design metal temperature used for impact tests shall be the design temperature of the pump, which will be specified on the Data Sheet.2.11 Nameplates and Rotation Arrows2.11.3 (Add): At least the following informations are required: Name

25、and address of the manufacturerPump type and size Item numberSerial number Rated capacityRated pressure Pump speedPower input Hydrostatic test pressureRated design pressure Rated design temperatureAdditionally, the item number and the casing hydrostatic test pressure shall be stamped on the discharg

26、e flange.2.12 QualityNo modifications.3 ACCESSORIESDrivers3.1.1 (Add): The Purchaser specifies and furnishes the pump driver. The driver will be shipped directly to Vendors work shop for mounting and alignment of the whole unit by the Vendor.In case the driver is not a standard electrical motor or a

27、 turbine, an outline drawing of the driver will be supplied to the Vendor.The Vendor shall provide all informations to enable the Purchaser to order the driver 3 weeks after pump purchase order.3.1.2 (Add): Anticipated process variations that may affect the sizing of the driver will be especially sp

28、ecified on Data Sheet.3.1.3 (Add): The starting conditions and starting method are specified on Pumps - Technical Specification - General and/or Data Sheer.3.1.5 (Add): See ,Pumps - Technical Specification - General and/or Data Sheet.3.1.6 (Add): Special motor starting-torque requirements will be sp

29、ecified on Pumps - Technical Specification -General11 and/or relevant Motor Data Sheet.3.1.8 (Add): See Pumps - Technical Specification - General and/or relevant Turbine Data Sheet.3.1.10 (Mod): If not specified otherwise, Vendors standard gears suitable for the specified operating conditions shall

30、be used.3.1.12 (Add): See Data Sheet.3.1.16 (Mod): Cog-belt or chain-type drive shall not be used if not specified otherwise.3.2 Couplings and Guards(Add): Coupling manufacturer and type will be specified on Data Sheet* and/or Tumps - Technical Specification - General,1.3.2.1 (Add): Only if especial

31、ly specified, couplings and coupling mountings shall comply with API Standard 671.3.2.5 (Add): If not specified otherwise, the coupling w川 be mounted by the Vendor.3.2.9 (Add): If not specified otherwise, nonsparking guards will be used.3.3 Mounting PlatesGeneral3.3.1.1 (Mod): Preferably a baseplate

32、 extending under the pump, gear and driver shall be supplied if not specified otherwise.3.3.1.2 .10 (Mod): Anchor bolts shall be supplied by the Vendor.3.3.2 Baseplate and Skid(Add): Ifnot specifiedotherwise, the baseplates shallbe a single fabricated steel unit.3.3.2.3 (Add): Ifnot specifiedotherwi

33、se, the baseplates shallbe provided with levelingpads.3.3.2.4 (Add): Ifnot specifiedotherwise, the baseplates shallbe designed for grouting.3.3.2.7 (Add): Ifnot specifiedotherwise, subplates shall be provided by the Vendor.3.3.2.8 (Add): If necessary for operating and maintenance, decking shall be p

34、rovided.Page 6Issue 05.20023.4 Controls and Instrumentation3.4.2 General3.4.1.3 Controls and instrumentation shall be in accordance with Purchasers instrument and control specification.3.4.3 Control Systems3.4.2.2 (Add): See Purchasers instrument and control specification and/or Data Sheet*.3.4.2.4

35、(Mod): A constant-speed governor and governor valve shall be furnished by the Vendor if not specified otherwise.3.4.3 Instrument and Control Panels3.4.3.1 (Add): See Purchasers instrument and control specification and/or Data Sheet.3.4.4 Instrumentation3.4.4.1 Tachometer(Add): See Purchasers instrum

36、ent and control specification and/or Data Sheer.3.4.4.5 Pressure Gauges(Add): See Purchasers instrument and control specification and/or Data Sheer.3.4.4.7 Relief Valves(Add): Relief valves for protection of the pump shall be provided by the Vendor if not specified otherwise.3.4.4.7.5 (Add): See Dat

37、a Sheef.3.4.4.8 Flow Indicators(Add): See Data Sheef.3.4.5 Alarms and Shutdowns(Add): See Purchasers instrument and control specification and/or Data Sheef.3.4.6 Electrical Systems3.4.6.1 (Add): See Pumps - Technical Specification - General” and/or Data Sheef.3.4.6.6 (Add): See Pumps - Technical Spe

38、cification - General11 and/or Data Sheef.3.5 Piping3.5.6 General(Add): Pipe wall thickness shall be suitable for the specified design data or as a minimum in accordance with Schedule 40.Copper tubings and brass fittings are unacceptable.No unon-soldred taper-bush type pipe unions“ shall be used.3.5.

39、4 Process Piping(Add): The limit of supply between Vendor and Purchaser are the inlet/outlet nozzles of the whole equipment (pump with accessories) if not specified otherwise on Data Sheet.3.5.4.3 (Add):The Vendor shall review all piping, appurtenances and vessels upstream and downstream of the pump

40、. Scope see Data Sheef.3.5.5 Cooling Water Piping (New- para)(Add): The cooling water piping on pumps shall be supplied by Vendor, terminating with flanges at the edge of the baseplate on pump side.(Add): Closed sight flow indicators are required for all cooling water systems if not specified otherw

41、ise.3.6 Pulsation and Vibration Control RequirementsGeneral(Add):The Vendor shall offer in his proposal suitable pulsation suppression devices. Informations about the preliminary issue of the Purchasers piping system design will be a part of the inquiry.3.6.1 Pulsation Design Approaches(Add): If not

42、 specified otherwise, the Vendor has to check the Purchasers final piping system design concerning detrimental pulsation and vibration.3.6.2.1 (Add): Normally for control of detrimental pulsation and vibration the Design Approach 3 shall be used. For further consideration the costs for Design Approa

43、ch 2 shall be quoted in the Vendors proposal.3.7 Special ToolsNo modifications.4 INSPECTION, TESTING, AND PREPARATION FOR SHIPMENTGeneral(Add): The Vendor shall state the provided scope of inspection and testing in his offer. Based on these informations, eventual additional inspections and tests wil

44、l be specified.4.1.1 (Add): All inspections and tests shall be carried out by the Vendor. Inspections and tests carried out by Purchaser will be agreed with the Vendor and noted in the purchase order.4.1.2 (Add): See 4.1.1 with additions.4.2 InspectionGeneral4.2.1.1 (Mod): Data acc. to a) and d) are

45、 not required.4.2.1.3 (Mod): See 4.1.1 with additions.4.2.2 Material inspection(Mod): See 4.1.1 with additions.4.2.2 Mechanical inspection(Add): The Vendor is responsible for the cleanliness of the equipment and shall make inspections as necessary.4.2.2.1 (Add): The Vendor shall submit his standard

46、for inspection and testing of the equipment.4.3 TestsTesting4.3.2.1 (Add): The following tests shall be performed on all pumps: Certified material test in accordance with Data Sheet”Certified hydrostatic test Certified performance testOther required tests w川 be specified on Data Sheet“ and/or purcha

47、se order.4.3.1.3 (Mod): The Vendor shall notify the Purchaser not less than ten (10) working days prior to the date of all agreed tests and inspections, so that the Purchaser may be present. After receipt of this notification the Purchaser will decide whether to be present.4.3.1.4 (Mod): See 4.3.1.1

48、 with additions.Page 8Issue 05.20024.3.2Hydrostatic T est4.3.2.1 (Mod): Minimum test pressure: 1.5 times design pressure.4.3.4 Performance Test, Power Pump4.3.4.3 (Add): Necessity of reduced speed or reduced pressure shall be noted for consideration in the proposal.4.3.5 T est T olerances(Add): For power pumps the following tolerances are acceptable: Capacity:Minus zero, plus 2 %

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 应用文书 > 解决方案

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知得利文库网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号-8 |  经营许可证:黑B2-20190332号 |   黑公网安备:91230400333293403D

© 2020-2023 www.deliwenku.com 得利文库. All Rights Reserved 黑龙江转换宝科技有限公司 

黑龙江省互联网违法和不良信息举报
举报电话:0468-3380021 邮箱:hgswwxb@163.com