【ASLA大奖】2008洛杉矶河流重建规划汇报文件英文版134p.2-02知识分享.ppt

上传人:豆**** 文档编号:52873313 上传时间:2022-10-24 格式:PPT 页数:67 大小:13.47MB
返回 下载 相关 举报
【ASLA大奖】2008洛杉矶河流重建规划汇报文件英文版134p.2-02知识分享.ppt_第1页
第1页 / 共67页
【ASLA大奖】2008洛杉矶河流重建规划汇报文件英文版134p.2-02知识分享.ppt_第2页
第2页 / 共67页
点击查看更多>>
资源描述

《【ASLA大奖】2008洛杉矶河流重建规划汇报文件英文版134p.2-02知识分享.ppt》由会员分享,可在线阅读,更多相关《【ASLA大奖】2008洛杉矶河流重建规划汇报文件英文版134p.2-02知识分享.ppt(67页珍藏版)》请在得力文库 - 分享文档赚钱的网站上搜索。

1、【ASLA大奖】2008洛杉矶河流重建规划汇报文件英文版134p.2-02 Still waters run deep.流静水深流静水深,人静心深人静心深 Where there is life,there is hope。有生命必有希望。有生命必有希望Verdugo Industrial Green ParkVerdugo Industrial Green ParkVerdugo Industrial Green ParkColorado St.Colorado St.Golden State FreewayGolden State FreewayVentura FreewayVentura

2、 FreewayGriffith ParkGriffith ParkSan Fernando Rd.San Fernando Rd.Broadway St.Broadway St.Brazil St.Brazil St.Doran St.Doran St.Verdugo Industrial Green ParkVerdugo Industrial Green ParkVerdugo Industrial Green ParkVerdugo Wash ConfluenceVerdugo Wash ConfluenceVerdugo Wash ConfluenceSan Fernando/Com

3、muter Rail BarrierSan Fernando/Commuter Rail BarrierSan Fernando/Commuter Rail BarrierPoor River OrientationPoor River OrientationPoor River OrientationVerdugo Industrial Green ParkVerdugo Industrial Green ParkVerdugo Industrial Green ParkColorado St.Colorado St.Golden State FreewayGolden State Free

4、wayVentura FreewayVentura FreewayGriffith ParkGriffith ParkSan Fernando Rd.San Fernando Rd.Broadway St.Broadway St.Brazil St.Brazil St.Doran St.Doran St.Verdugo Industrial Green ParkVerdugo Industrial Green ParkVerdugo Industrial Green ParkAlternative A(Long-term)Alternative A(Long-term)Alternative

5、A(Long-term)Brazil Street PromenadeBrazil Street PromenadePedestrian/Equestrian Pedestrian/Equestrian Bridge to Griffith ParkBridge to Griffith ParkImproved Pedestrian Improved Pedestrian Crossing at Doran,Brazil Crossing at Doran,Brazil and Coloradoand ColoradoGreenway Connection to Greenway Connec

6、tion to Glendale River Walk and Glendale River Walk and North Atwater ParkNorth Atwater ParkTerraced Verdugo WashTerraced Verdugo WashRealigned and Braided Realigned and Braided Verdugo Wash Verdugo Wash ConfluenceConfluenceVerdugo Industrial Green ParkVerdugo Industrial Green ParkVerdugo Industrial

7、 Green ParkAlternative B(Long-term)Alternative B(Long-term)Alternative B(Long-term)Grade Separated Crossings at Grade Separated Crossings at Doran and BrasilDoran and BrasilBrazil Street PromenadeBrazil Street PromenadePedestrian/Equestrian Bridge to Pedestrian/Equestrian Bridge to Griffith ParkGrif

8、fith ParkImproved Pedestrian Crossing Improved Pedestrian Crossing at Doran,Brazil and Coloradoat Doran,Brazil and ColoradoGreenway Connection to Greenway Connection to Glendale River Walk and North Glendale River Walk and North Atwater ParkAtwater ParkRiver Element on West SideRiver Element on West

9、 SideTerraced Verdugo WashTerraced Verdugo WashRealigned and Braided Verdugo Realigned and Braided Verdugo Wash ConfluenceWash ConfluenceVerdugo Industrial Green ParkVerdugo Industrial Green ParkVerdugo Industrial Green ParkPhasingPhasingPhasing1.River Greenway1.River Greenway2.Open Space Network Ex

10、pansion2.Open Space Network Expansion3.River Zone Completion3.River Zone Completion4.Open Space Connectivity4.Open Space ConnectivityVerdugo Industrial Green ParkVerdugo Industrial Green ParkVerdugo Industrial Green ParkPossible Channel Improvements-Alternative BPossible Channel Improvements-Alterna

11、tive BPossible Channel Improvements-Alternative BNote:This illustration is a concept that is still under study for hydraulic and regulatory feasibility.Verdugo Industrial Green ParkVerdugo Industrial Green ParkVerdugo Industrial Green ParkOpen Space Network ContextOpen Space Network ContextOpen Spac

12、e Network ContextVerdugo Industrial Green ParkVerdugo Industrial Green ParkVerdugo Industrial Green ParkOpen Space Network ContextOpen Space Network ContextOpen Space Network ContextTaylor YardTaylor YardTaylor YardGlendale FreewayGlendale FreewaySan Fernando RoadSan Fernando RoadElysian ParkElysian

13、 ParkTaylor YardTaylor YardTaylor YardGolden State FreewayGolden State FreewayTaylor YardTaylor YardTaylor YardElysian ValleyElysian ValleyElysian ValleyDorris Place ElementaryDorris Place ElementaryDorris Place ElementaryKnox Avenue EastKnox Avenue EastKnox Avenue EastConfluence 110&San FernandoCon

14、fluence 110&San FernandoConfluence 110&San FernandoGlendale FreewayGlendale FreewaySan Fernando RoadSan Fernando RoadElysian ParkElysian ParkTaylor YardTaylor YardTaylor YardGolden State FreewayGolden State FreewayTaylor YardTaylor YardTaylor YardA AAlternative A(Long-term)lternative A(Long-term)lte

15、rnative A(Long-term)Contiguous Open Space Along Contiguous Open Space Along the River the River Interconnected Greenway Interconnected Greenway System along the river and System along the river and within the adjacent within the adjacent neighborhoodsneighborhoodsPedestrian Bridge Across the Pedestr

16、ian Bridge Across the RiverRiverPedestrian Connection to Pedestrian Connection to Elysian ParkElysian ParkTaylor YardTaylor YardTaylor YardPossible Channel Improvements-Alternative APossible Channel Improvements-Alternative APossible Channel Improvements-Alternative ANote:This illustration is a conc

17、ept that is still under study for hydraulic and regulatory feasibility.Taylor YardTaylor YardTaylor YardAlternative B(Long-term)Alternative B(Long-term)Alternative B(Long-term)Braided Secondary River Braided Secondary River Channel Channel Interconnected Greenway Interconnected Greenway System along

18、 the river and System along the river and within the adjacent within the adjacent neighborhoodsneighborhoodsPedestrian Bridge Across the Pedestrian Bridge Across the RiverRiverPedestrian Connection to Pedestrian Connection to Elysian ParkElysian ParkTaylor YardTaylor YardTaylor YardPossible Channel

19、Improvements-Alternative BPossible Channel Improvements-Alternative BPossible Channel Improvements-Alternative BNote:This illustration is a concept that is still under study for hydraulic and regulatory feasibility.Taylor YardTaylor YardTaylor YardPhasingPhasingPhasing1.River Greenway1.River Greenwa

20、y2.Open Space Network Expansion2.Open Space Network Expansion3.River Zone Completion3.River Zone Completion4.Open Space Connectivity4.Open Space ConnectivityTaylor YardTaylor YardTaylor YardPhasingPhasingPhasingVerdugo Industrial Green ParkVerdugo Industrial Green ParkVerdugo Industrial Green ParkOp

21、en Space Network ContextOpen Space Network ContextOpen Space Network ContextTaylor YardTaylor YardTaylor Yard Open Space Network ContextOpen Space Network ContextOpen Space Network ContextCornfields/Chinatown AreaCornfields/Chinatown AreaCornfields/Chinatown AreaSpring St.Spring St.BroadwayBroadwayM

22、ain St.Main St.DWPDWPMission Road YardsMission Road YardsElysian ParkElysian ParkCornfields/Chinatown AreaCornfields/Chinatown AreaCornfields/Chinatown AreaFuture State ParkFuture State ParkFuture State ParkConsolidated OwnershipConsolidated OwnershipConsolidated OwnershipProximity to TransitProximi

23、ty to TransitProximity to TransitDWP Exchange StationDWP Exchange StationDWP Exchange StationSpring St.Spring St.BroadwayBroadwayMain St.Main St.DWPDWPMission Road YardsMission Road YardsElysian ParkElysian ParkCornfields/Chinatown AreaCornfields/Chinatown AreaCornfields/Chinatown AreaCornfields/Chi

24、natown Area Cornfields/Chinatown Area Cornfields/Chinatown Area Alternative A(Long-term)Alternative A(Long-term)Alternative A(Long-term)Rail on StructureRail on StructureTerraced Channel Wall with Linear Terraced Channel Wall with Linear Park space along the riverPark space along the riverLinear Ope

25、n Space between Linear Open Space between Cornfields and RiverCornfields and RiverPerimeter Greenway SystemPerimeter Greenway SystemPedestrian Bridge Elysian ParkPedestrian Bridge Elysian ParkGreen Street connections on Main Green Street connections on Main and Spring Street into Downtownand Spring

26、Street into DowntownCornfields/Chinatown AreaCornfields/Chinatown AreaCornfields/Chinatown AreaPossible Channel Improvements-Alternative APossible Channel Improvements-Alternative APossible Channel Improvements-Alternative ANote:This illustration is a concept that is still under study for hydraulic

27、and regulatory feasibility.Cornfields/Chinatown AreaCornfields/Chinatown AreaCornfields/Chinatown AreaAlternative B(Long-term)Alternative B(Long-term)Alternative B(Long-term)Braided River Channel with Braided River Channel with Open Space IslandOpen Space IslandLinear Open Space between Linear Open

28、Space between Cornfields and RiverCornfields and RiverPerimeter Greenway SystemPerimeter Greenway SystemPedestrian Bridge Elysian Pedestrian Bridge Elysian ParkParkGreen Street connections on Green Street connections on Main and Spring Street into Main and Spring Street into DowntownDowntownCornfiel

29、ds/Chinatown AreaCornfields/Chinatown AreaCornfields/Chinatown AreaPossible Channel Improvements-Alternative BPossible Channel Improvements-Alternative BPossible Channel Improvements-Alternative BNote:This illustration is a concept that is still under study for hydraulic and regulatory feasibility.C

30、ornfields/Chinatown AreaCornfields/Chinatown AreaCornfields/Chinatown AreaPhasingPhasingPhasing2.Open Space Network Expansion2.Open Space Network Expansion3.River Zone Completion3.River Zone Completion1.River Greenway1.River Greenway4.Open Space Connectivity4.Open Space ConnectivityCornfields/Chinat

31、own AreaCornfields/Chinatown AreaCornfields/Chinatown AreaOpen Space Network ContextOpen Space Network ContextOpen Space Network ContextDowntown Industrial AreaDowntown Industrial AreaDowntown Industrial Area4 4thth Street Street7 7thth Street Street1 1stst Street Street6 6thth Street StreetSanta Mo

32、nica FreewaySanta Monica FreewayBoyle StreetBoyle StreetDowntown Industrial AreaDowntown Industrial AreaDowntown Industrial AreaAlameda St.Alameda St.Downtown Industrial AreaDowntown Industrial AreaDowntown Industrial AreaStable Residential NeighborhoodsStable Residential NeighborhoodsStable Residen

33、tial NeighborhoodsEmerging Residential UsersEmerging Residential UsersEmerging Residential UsersRail is a barrier to the RiverRail is a barrier to the RiverRail is a barrier to the RiverConnectivity ProblemsConnectivity ProblemsConnectivity Problems4 4thth Street Street7 7thth Street Street1 1stst S

34、treet Street6 6thth Street StreetSanta Monica FreewaySanta Monica FreewayBoyle StreetBoyle StreetDowntown Industrial AreaDowntown Industrial AreaDowntown Industrial AreaAlameda St.Alameda St.Downtown IndustrialDowntown IndustrialDowntown IndustrialAlternative A(Long-term)Alternative A(Long-term)Alte

35、rnative A(Long-term)Rail realigned to Rail realigned to follow eastern follow eastern most tracksmost tracksPedestrian Pedestrian underpasses underpasses below railbelow railRiver Greenway on River Greenway on both sides of the both sides of the RiverRiverGreenway Greenway connection to connection t

36、o Hollenbeck ParkHollenbeck ParkGreen Street Green Street Connections to Connections to Pico Aliso HousingPico Aliso HousingRegional Regional Connections on Connections on 1st,4th,6th and 1st,4th,6th and 7th Streets7th StreetsFin wall provides Fin wall provides access to Riveraccess to RiverInflatab

37、le dams Inflatable dams create pools create pools Downtown Industrial AreaDowntown Industrial AreaDowntown Industrial AreaPossible Channel Improvements-Alternative APossible Channel Improvements-Alternative APossible Channel Improvements-Alternative ANote:This illustration is a concept that is still

38、 under study for hydraulic and regulatory feasibility.Downtown IndustrialDowntown IndustrialDowntown IndustrialAlternative B(Long-term)Alternative B(Long-term)Alternative B(Long-term)Depressed or Depressed or Elevated RailElevated RailLarge Riverfront Large Riverfront Park with Park with Recreationa

39、l FieldsRecreational FieldsConnection to Connection to Hollenbeck ParkHollenbeck ParkGreen Street Green Street Connections to Pico Connections to Pico Aliso HousingAliso HousingRegional Regional Connections on 1Connections on 1stst,4 4thth,6,6thth and 7 and 7thth StreetsStreetsRiver Greenway on Rive

40、r Greenway on west side of Riverwest side of RiverTerraced River Wall Terraced River Wall with Open space with Open space and Habitatand HabitatDowntown Industrial AreaDowntown Industrial AreaDowntown Industrial AreaPossible Channel Improvements-Alternative BPossible Channel Improvements-Alternative

41、 BPossible Channel Improvements-Alternative BNote:This illustration is a concept that is still under study for hydraulic and regulatory feasibility.Downtown IndustrialDowntown IndustrialDowntown IndustrialAlternative C(Long-term)Alternative C(Long-term)Alternative C(Long-term)Through Rail lines Thro

42、ugh Rail lines from West moved to from West moved to Eastern Bank of the Eastern Bank of the RiverRiverRedevelopment Redevelopment Deck and Open Deck and Open Space over MTA Space over MTA Maintenance YardsMaintenance YardsConnection to Connection to Hollenbeck ParkHollenbeck ParkGreen Street Green

43、Street Connections to Pico Connections to Pico Aliso HousingAliso HousingRegional Regional Connections on 1Connections on 1stst,4 4thth,6,6thth and 7 and 7thth StreetsStreetsRiver Greenway on River Greenway on East side of RiverEast side of RiverTerraced River Wall Terraced River Wall with Open spac

44、e and with Open space and HabitatHabitatDowntown IndustrialDowntown IndustrialDowntown IndustrialPotentialPotentialPotential PhasingPhasingPhasing2.Open Space Network Expansion2.Open Space Network Expansion3.River Zone Completion3.River Zone Completion1.River Greenway 1.River Greenway 4.Open Space C

45、onnectivity4.Open Space ConnectivityDowntown Industrial Downtown Industrial Downtown Industrial Open Space Network ContextOpen Space Network ContextOpen Space Network ContextCommunity MeetingCommunity MeetingJune 2008June 2008LOS ANGELES RIVERLOS ANGELES RIVERECOSYSTEM RESTORATION ECOSYSTEM RESTORAT

46、ION FEASIBILITY STUDYFEASIBILITY STUDYU.S.Army Corps of EngineersCity of Los Angeles Bureau of EngineeringWelcome!Lets Get Started Study ObjectivesStudy Objectives Study PartnershipsStudy Partnerships Corps of Engineers Corps of Engineers Civil Works ProcessCivil Works Process Feasibility Study Feas

47、ibility Study Incorporate a watershed perspective for Incorporate a watershed perspective for this study to improve the overall health ofthis study to improve the overall health of the Los Angeles Basin the Los Angeles BasinLos Angeles River Feasibility Study Los Angeles River Feasibility Study Obje

48、ctives:Objectives:Restore a degraded urban river environment Restore a degraded urban river environment to a more natural riparian habitatto a more natural riparian habitat Habitat restoration for native species Habitat restoration for native species Provide additional recreation and open Provide ad

49、ditional recreation and open space opportunities along the river corridorspace opportunities along the river corridorFeasibility Study Partner:Feasibility Study Partner:Feasibility Study Partner:City of Los Angeles Department of Public Works,City of Los Angeles Department of Public Works,Bureau of E

50、ngineeringBureau of EngineeringParticipates in the decision process and the Participates in the decision process and the preparation of decision documentspreparation of decision documents costs and schedules costs and schedules objectives objectives designdesign plan selection plan selection project

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 教育专区 > 小学资料

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知得利文库网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号-8 |  经营许可证:黑B2-20190332号 |   黑公网安备:91230400333293403D

© 2020-2023 www.deliwenku.com 得利文库. All Rights Reserved 黑龙江转换宝科技有限公司 

黑龙江省互联网违法和不良信息举报
举报电话:0468-3380021 邮箱:hgswwxb@163.com