最新JT-绞车外文翻译.doc

上传人:1595****071 文档编号:35280204 上传时间:2022-08-21 格式:DOC 页数:52 大小:178KB
返回 下载 相关 举报
最新JT-绞车外文翻译.doc_第1页
第1页 / 共52页
最新JT-绞车外文翻译.doc_第2页
第2页 / 共52页
点击查看更多>>
资源描述

《最新JT-绞车外文翻译.doc》由会员分享,可在线阅读,更多相关《最新JT-绞车外文翻译.doc(52页珍藏版)》请在得力文库 - 分享文档赚钱的网站上搜索。

1、Four short words sum up what has lifted most successful individuals above the crowd: a little bit more.-author-dateJT-绞车外文翻译Davis, CDavis, C. S, S. M Ggllager, and M. S Berman. The Video Planlton Recorder (VPR) Design and initial results Arch Hydrobiol Beih, 36,pp 67-81,1992Abstract First、 Schedulin

2、g and the structural characteristics of winch scheduling winch is used to dispatch vehicles to assist traction and operating a winch. Commonly used in the mine tunnel in the haulage and supporting mine car handling、 can also be used in the mining face、 with scheduling space station、 heavy cars. Sche

3、duling winch is full-gear transmission machinery. Gear also known as the round of the transmission system. According round of the transmission gear when the axis of space in the relative position is fixed、 can be divided into fixed and working capital of the axis round of the round. Another round of

4、 the axis of cylindrical mesh gear transmission and the cylindrical mesh gear transmission of points、 and turnover of another round of transmission and differential planetary transmission of the points. Scheduling the winch within the existing transmission gear meshing cylindrical Gear、 another plan

5、etary transmission、 scheduling winch planetary transmission gear、 also known as the winch. Scheduling winch models commonly used mainly JD-0.4 (JD-4.5)、 JD-1 (JD) -11.4)、 JD-1. (JD-22)、 JD-2 (JD-25)、 JD-3 (JD - 40). Below the JD-3 (that is、 JD-40) as an example of scheduling winch on the composition

6、 and scheduling transmission principle. (A) JD-3-scheduling of the winch JD-3-scheduling the main component of the winch drum for、 brakes and motor frame. From the winch drum made of cast steel、 its main function is winding rope traction load. Drum、 and the slowdown in gear with the gear. Winch on t

7、he two groups with a total installed-gate that is Brake 2、the gateway 3. Motor side of the gate 2 to brake drum brakes、 the gear in the work of three gates used to control Z7 group functioning. Use made of cast iron frame、 the motor bearings and gates with stent-positioning are fixed with bolts in t

8、he plane seat. For Flameproof for the thee-phase motor .(B) JD-3-Dispatch winch the drive principle this type of winch used two Internal Drives and a planetary gear transmission. Z1/Z2 and Z3/Z4 for two Internal Drive、 Z5、 Z6、 Z7 composition of planetary transmission mechanism. Motor head in the ins

9、tallation of a 5-axis extended sets of gear Z1、 through the gears Z2、 with gear Z3 and Z4、 the movement spread to gear Z5、 the Z5 is the planetary gear wheel of a central round (or round of the Sun) And then led the two planetary gear Z6、 and the gear Z7. Planetary gear freely installed in the two d

10、riven and connected to a fixed axis、 the largest in the gear Z7 Gear work with the external gateway、 used to control winch drum operation. If the big gear Z7 gate on the work of three gates to live、 and will be on the brake drum gates 2 release、 this time by two motor rotation within the rodents to

11、gear wheel drive Z5、 Z6 and Z7. However、 due to Z7 gate has been living and can not rotate、 so gear Z6 only on the one hand around its own axis of rotation、 but also around the axis of gear Z5 (drum center) to the public. Thus connected with the rotation of the lead、 then Z6 the operation mode very

12、similar to the planets in the solar system (such as Earth) movement、 also known as the planetary gear Z6、 its transmission mode known as the planetary transmission. Conversely、 if the gear Z7 in the work release gate 3、 and will brake drum on the live gate 2、 the Z6 directly connected with the drum、

13、 only for the rotation、 not revolution、 the Z1 from the transmission system changed to Z7 For the fixed axis of the round、 gear Z7 to go short. Inverted for the release (or live gate) gate work Brake 2 or 3、 you can make scheduling winch in the case of non-stop motor to achieve operating and parking

14、. When the need to reverse upgrade、 must be re-activated the launch button、 reverse the motor running. It should be noted that、 when the motor is turned on、 the gate and not allowed to work Brake live gate at the same time、 it will burn motor or other accidents. Second、 scheduling winch day-to-day m

15、aintenance check the contents of (1) check each part of bolts、 pin、 nuts、 washers、 etc.、 if loose、 loss should be tightened and timely complement. (2) to check installations and electrical signal Operation button is intact and whether stolen explosive phenomenon、 whether the signal sent clear and br

16、ight、 it should be repaired or replaced. (3) to check whether damaged or broken drum、 the first wire rope is firmly fixed、 bearing oil spill there、 the rope is neatly arranged、 the problems should be promptly dealt with. (4) inspection gate with a crack-free、 wear-gauge whether or not (should have a

17、 thickness of not less than 3 mm)、 the tension bar bolts、 fork first、 the gate、 such as whether there is a pin deformation or injury、 whether the loose nuts back tight、 Problems should be adjusted and dealt with. (5) Check the gate and lever action is a flexible system、 Shi gate、 the ate may not rea

18、ch the level position、 it should be slightly Sangria than the horizontal position. (6) to check the roof fixed winch-and-beam is solid、 based on whether there is a bolt or bolts loose、 whether crack base、 the issue should be dealt with promptly. (7) To check whether the normal start motor idling、 wh

19、ether good grounding to start with、 and so whether the explosion-proof electrical equipment and good demand. (8) Check bearings and motors、 switches、 cables、 such as whether the gate with the temperature too high、 the problem should be found to identify the reasons for、 to take measures to deal with

20、. (9) Often wipe winch to remove dust and debris、 and maintain the environment clean and tidy. Winch the safe operation、 inspection and maintenance Third、 winch common faults and deal with (A) a winch drum abnormal sound and the main approach 1. Winch drum produce abnormal sound the main reason (1)

21、drum cartridge case bolts loose. (2) Shell and tube-round (flange) gap between too large. (3) Drum cylinder shell cracks. (4) Welding a cylinder shell welding. (5) Walks drum and hub of the fixed screw loose、 causing swimming drum and hub between the relative sliding. (6) Gap between the hub and spi

22、ndle wear too large. (7) A clutch worm screw loose. 2. Approach According to the inspection to determine treatment. If the loosening of the nut、 in Jiao Ban shutdown when fastening If noise is not serious、 may be appropriate to reduce winch load、 pay attention to observe、 to maintain the provisions

23、of the maintenance shutdown at the repair if the beep serious、 they should immediately Parking repaired or replaced、 so as to avoid accidents expand. (B) On the rope winch drum with Bu Shangri hazards、 causes and treatment methods、 1. Winch drum on the rope with the harm Bu Shangri (1) speed up the

24、rope wear. Rope in the mess on the winding drum、 traction force to justice often ranked in the mess in the rope and pressure to get out、 causing serious wear、 resulting in diameter steel wire rope and wire break more ground and shorten the life of the rope. (2) Of wire rope slid off the drum. Rope w

25、ith Bu Shangri、 an inevitable phenomenon of a crowded heap for damage to justice board、 when the reactor crowded the edge of more than high rollers、 the rope easily slid off the drum、 light、 broken wires、 heavy sports car、 and broken rope. 2. Winch drum on the main rope with Bu Shangri (1) winch lay

26、out properly that is hoisting cable angle non-compliance requirements. (2) Winch Titanium (Preliminary round) Quemoy not with the rope on the winding drum at about sliding. (3) Ranked rope winch device failure or have been removed. (4) Improper operation the wound is not tight. 3. Approach According

27、 to different situations symptomatic treatment. The installation of quality and exclusive rope devices such as the failure to timely report on the request sent treatment、 operation or maintenance of an improper、 we should conscientiously in accordance with the provisions of meticulous operation and

28、maintenance; Inclined Drift winch paying particular attention to removing obstacles on their way to prevent the re-delegate Of Mandrel、 tight-rope Mandrel. (C) Winch reducer operation abnormal sound and vibration generated in the causes and treatment 1. Reducer functioning of abnormal sound and vibr

29、ation generated in the main (1) gears meshing space tight or too loose. (2) Bearing gap is too large、 the general performance of the decentralization empty at the beep、 beep when upgrading heavy small. (3) Or bearing reducer bolts loose. (4) Reducer in the swap was foreign bodies. 2. Approach (1) ad

30、justing the gears meshing gap to a suitable position、 if the wear and gear should be replaced. (2) Relaxation of the repair or replacement of bearings. (3) Pay attention to tighten loose screws. (4) If it has fallen into foreign body reducer、 should be immediately suspended、 and troubleshooting. (D)

31、 Winch brake gate of the reasons for and treatment of fever 1. Brake winch for fever (1) a gate too early、 too excessive. (2) Weights are often delegated to use Brake、 no electrical power winch braking system EC、 single-drum winch often such a situation. (3) Brake shoe loose bolts or excessive brake

32、 wear、 the bolt hit the first round of gate (or gateway disc). (4) Brake shoe and the gateway round (or gateway disk) was not installed correctly; the contact area is too small. (5) Gate Ferry (or gateway disc) swing more. 2. Prevention and treatment Constantly sum up experience in operations、 and e

33、xplore methods of operation and improve the level of technique; strict winch the safe operation、 inspection and maintenance of traction control grid load、 no-load、 do not send delegate at the motor-vehicle gate flying; regular maintenance checks、 pay attention to brake shoe and the gateway Round (or

34、 gate-) exposure. (5) Disc Brake-meters does not deal with the causes and prevention methods 1. Brake-song disc is not the main meters (1) brake operation handle screw drawbars length adjustment inappropriate. (2) Brake operation handle swing point of view inappropriate. (3) Relief valve plug the ho

35、le cut expenditure or slide valve failure death card. (4) Relief valve surge devices or electro-hydraulic oil spills. (5) electro-hydraulic device moves lap surge Inch Xian welding is not strong or disconnected. 2. Prevention approaches the timely adjustment of brake operation handle moves location、

36、 regular cleansing of the hydraulic system of oil filters、 hydraulic oil to maintain the cleanliness and avoid valve plug the hole. (6) The launch button、 do not turn the winch motor and Treatment 1. Main (1) A power failure、 such as power failures、 break phase、 motor or grounding line、 grounding th

37、e protection of power supply voltage or too low. (2) Stop button did not recover bit. (3) Have launched internal fault. (4) Cable operator disconnected. (5) Motor burned. 2. Approach To check power、 such as the local power supply cables on the other electrical and mechanical equipment are a fixed、 i

38、t would surely is the power blackout、 should be promptly reported that the request transmission. Check the button、 we must switch handle hit by power outage location、 check the button may be open、 not to repair its damaged in the explosion-proof performance. Several other conditions must be full-tim

39、e electrician to check processing. (7) The stop button、 the motor does not stop the causes and treatment 1. Main(1) Operating button failures or too wet. (2) Operation of short circuit or grounding. (3) Magnetic starter for the main contact point or burning auxiliary contact adhesive and can not lea

40、ve. (4) arc-suppression hood stuck contact、 could not leave. (5) Contact between the open relays. (6) Magnetic starter placed unrighteousness、 touch or backward dumping beyond 15 .2. Approach Should urgently Fishing magnetic starter、 to winch their magnetic starter handle the operation to stop fight

41、ing position. Pre-gate method should be used first to raise load stopped to prevent Lash starter when the magnetic switch in isolation have too great a power outage sparks. (8) Single-phase operation of the motor causes and treatment 1Winch motor single-phase operation of the characteristics and haz

42、ards (1) Whether positive start、 or reverse start、 the electrical occurred dull hum、 but the motor will not always turn. (2) If a motor running in single-phase operation、 while still maintaining the original motor to spin、 but obviously slow down the speed、 a humming sound、 the electrical start feve

43、r、 if the winch with Ammeter、 some point to zero、 Some larger current value. Whether or activated in motor running single-phase operation、 if not timely detection and shutdown、 it may be burning motor for the accident. 2. Single-phase operation of a motor for (1) Lack of power (of a fault). This is

44、because of a broken fuse or a disconnection of contacts and a phase-connection is bad、 and so causes. (2) Motor stator windings of a break. Stator windings at this time because of the different connection mode、 the impact of differentiated、 that is、 stars (丫) of wiring than 1.30 () of wiring serious

45、. 3. Approach Rapid shut down to identify reasons for the timely reporting or maintenance electrician for processing. 摘要一、调度绞车及其结构特点调度绞车是常用来调度车辆及进行辅助牵引作业的一种绞车。常用于矿井巷道中拖运矿车及辅助搬运,也可用在采掘工作面、装车站调度空、重载矿车。 调度绞车是一种全齿传动机械。齿轮传动系统又称轮系。根据轮系传动时各齿轮轴线在空间的相对位置是否固定,可分为定轴轮系和周转轮系。定轴轮系又有外啮合圆柱齿轮传动和内啮合圆柱齿轮传动之分,而周转轮系又有差动

46、传动和行星传动之分。调度绞车的传动齿轮既有内啮合圆柱齿轮传动,又有行星传动,所以调度绞车又称内齿轮行星传动绞车。 调度绞车常用型号主要有JD0.4(JD4.5)、JD1(JD)11.4)、JD1.(JD22)、JD2(JD25)、JD3(JD40)等。 下面以JD3(即JD40)型调度绞车为例介绍调度绞车的组成及传动原理。 (一)JD3型调度绞车的组成 JD3型调度绞车的主要组成部分为滚筒、制动装置机座和电动机。绞车滚筒由铸钢制成,其主要功能是缠绕钢丝绳牵引负荷。滚筒内和大内齿轮下装有减速齿轮。 绞车上共装有两组带式闸,即制动闸2,工作闸3。电动机一侧的制动闸2用来制动滚筒,大内齿轮上的工作闸

47、3用于控制Z7组运转。 机座用铸铁制成,电动机轴承支架及闸带定位板等均用螺栓固定在机座上。电动机为专用隔爆三相笼型电动机。 (二)JD3型调度绞车的传动原理 该型绞车采用两级内啮合传动和一级行星轮传动。Z1/Z2和Z3/Z4为两级内啮合传动,Z5、Z6、Z7组成行星传动机构。 在电动机5轴头上安装着加长套的齿轮Z1,通过内齿轮Z2、齿轮Z3和内齿轮Z4,把运动传到齿轮Z5上,齿轮Z5是行星轮系的中央轮(或称太阳轮),再带动两个行星齿轮Z6和大内齿轮Z7。行星齿轮自由地装在2根与带动固定连接的轴上,大内齿轮Z7齿圈外部装有工作闸,用于控制绞车滚筒运转。 若将大内齿轮Z7上的工作闸3闸住,而将滚筒上的制动闸2松开,此时电动机转动由两级内啮轮传动到齿轮Z5、Z6和Z7。但由于Z7已被闸住,不能转动,所以齿轮Z6只能一方面绕自己的轴线自转,同时还要绕齿轮Z5的轴线(滚筒中心线)公转。从而带动与其相连的带动转动,此时Z6的运行方式很类似太阳系中的行星(如地球)的运动方式,齿轮Z6又称行星齿轮,其传动方式称为行星传动。 反之,若将大内齿轮Z7上的工作闸3松开,而将滚筒上的制动闸2闸住,因Z6与滚筒直接相连,只作自转,没有公转,从Z1到Z7的传动系统变为定轴轮系,齿轮Z7做空转。倒替松开

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 教育专区 > 成人自考

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知得利文库网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号-8 |  经营许可证:黑B2-20190332号 |   黑公网安备:91230400333293403D

© 2020-2023 www.deliwenku.com 得利文库. All Rights Reserved 黑龙江转换宝科技有限公司 

黑龙江省互联网违法和不良信息举报
举报电话:0468-3380021 邮箱:hgswwxb@163.com