贸易术语英文案例及解析.doc

上传人:豆**** 文档编号:24076982 上传时间:2022-07-03 格式:DOC 页数:3 大小:122KB
返回 下载 相关 举报
贸易术语英文案例及解析.doc_第1页
第1页 / 共3页
贸易术语英文案例及解析.doc_第2页
第2页 / 共3页
点击查看更多>>
资源描述

《贸易术语英文案例及解析.doc》由会员分享,可在线阅读,更多相关《贸易术语英文案例及解析.doc(3页珍藏版)》请在得力文库 - 分享文档赚钱的网站上搜索。

1、【精品文档】如有侵权,请联系网站删除,仅供学习与交流贸易术语英文案例及解析.精品文档.国际贸易英文案例及解析1. A Chinese exporter signed a CFR contract with an importer in American on canned meat for an amount of US$50000,with payment by D/P at sight. On the morning of May 5,2006,the goods were all loaded onto the named vessel. The Chinese salesperson

2、in charge of this contract was so busy that he forgot to send the buyer the shipping advice until the next morning. Unexpectedly, when the American importer went to the local insurance company to insure the goods, the insurance company had already learned that the ship suffered a wreck on May 6 and

3、refused to insure the shipment. The American importer immediately sent a fax to the Chinese exporter saying owing to your delayed shipping advice, we are unable to insure the goods. Since the vessel has been destroyed in a wreck, the loss of goods should be for your account. At the same time, you sh

4、ould compensate our profit and expense losses which amount to US$50000.Soon all the shipping documents sent through the collecting bank were returned to the Chinese exporter ,for the reason that the importer refused to take up the shipping documents. Who should be responsible for the loss and why?Th

5、e Chinese should be responsible for the loss. As per the clause of CFR term, the exporter is responsible for notifying the shipping details ASAP and the importer can arrange the insurance in time. If the notify delayed and cause the loss without insurance covering, the exporter must bear the loss.2.

6、A Chinese international trade company exported a batch of walnut to England on the basis of CIF London.As it was a seasonal commodity,it was stipulated in the contract that the covering L/C should reach the seller before the end of September.The seller guaranteed that the vessel would reach the port

7、 of destination not latter than December 2.If the vessel reached the port of destination later than that day,the buyer was entitled to cancel the contract.In case the payment had been made,the seller should return the payment to the buyer .Then,where do you think the crux lies in this case?In this case, the crux lies is the date of reaching the destination.Because it is normal for vessel delay on sea shipment. The seller cannot control the shipping times on the sea. So the L/C should amend for the reach time, instead of the departure time.

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 教育专区 > 小学资料

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知得利文库网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号-8 |  经营许可证:黑B2-20190332号 |   黑公网安备:91230400333293403D

© 2020-2023 www.deliwenku.com 得利文库. All Rights Reserved 黑龙江转换宝科技有限公司 

黑龙江省互联网违法和不良信息举报
举报电话:0468-3380021 邮箱:hgswwxb@163.com